2nd Story Dormer Addition

Leska helped with actual dormer design. Customer original desire was to create tiny closet. Leska actually suggest to frame this dormer and to solve owners every desire.
#1. To create closet
#2. Have new master bathroom
#3. Create lights and much more space in the master bathroom.
The frming part was straight forward. LVL lumber was use for the structural opening. 2x6 lumber used for new walls. 2x12 rafters for ceilings. Additional Leska design input was not to frame the bathroom walls all the way to the ceiling and modify the hallway to angled to shorten the hallway area.
Bathroom area have heated flooring. Build in Jazucci also house totally concealed acess panel.

Follow Me